Photo » The ramp up to the temporary Mill of Keir bridge. 01.09.13

Photo of The ramp up to the temporary Mill of Keir bridge. 01.09.13
Photo Title:
The ramp up to the temporary Mill of Keir bridge. 01.09.13
Description:
The ramp up to the temporary Mill of Keir bridge. The build up is around 7ft high. Even 10mph would be too fast to negotiate the turn onto the bridge as it is around a 40ft drop down to the river if you were to go through one of the concrete barriers!
Gallery:
Infrastructure
Uploaded:
Sunday 01 of September, 2013 [17:38:04 UTC] by jwwemyss
 
Copyright of this image remains with the person who uploaded it and it may not be used without their permission
Add to a mesage:
Add to the wiki:
Add thumbnail to the wiki: