Three Con-arch sections of Span 4 of Shore Road bridge are now in place by jwwemyss
Red Snapper wagons sit on the line at Causewayhead Road bridge 15.09.13 by jwwemyss
Track renewal south of Kerse Road on the Up Main 15.09.13 by jwwemyss
The remains of Spans 1, 2 and 3 of Shore Road's deck await recycling by jwwemyss
Now its reconstruction time at Shore Road. 15.09.13 by jwwemyss
Demolition of Shore Road bridge complete. 15.09.13 by jwwemyss
Stirling P.6's track back in place by jwwemyss
Anything else in this view at Stirling becoming history in the next 24 hours by jwwemyss
The breaker's yard for the deck sections from Shore Road by jwwemyss
A close up of a deck section of Span 1 getting lifted out by jwwemyss
A deck section of Span 1 gets lifted out by jwwemyss
Lifting operations at Span 1 stopped whilst the tamper works at the top end of P.6 by jwwemyss
A hive of activity at Shore Road by jwwemyss
Drainage works just north of Kerse Road bridge on 14.09.13 by jwwemyss
Stirling Station from Forthside bridge on 14.09.13 by jwwemyss
Looking towards Shore Road from Forthside bridge on 14.09.13 by jwwemyss
Reballasting of P.6 at Stirling underway on 14.09.13 by jwwemyss
Pier 3 at Shore Road being reduced to level by jwwemyss
Spans 2 and 3 are now removed at Shore Road by jwwemyss
The view at 11.00 at Shore Street on 14.09.13 by jwwemyss
Looking towards Shore Road at 11.00 on 14.09.13 by jwwemyss
X marks the spot. The sleepers that are to be replaced at Dunblane Station's southern points. by jwwemyss
The scaffolding being erected on the Allan Water Viaduct at Dunblane by jwwemyss
The 450tonne crane has now swapped sides at Stirling by jwwemyss
The crane base being positioned onto the perched jib at Stirling by jwwemyss
The BIG crane being set up at Stirling by jwwemyss
Thunderbirds are go. The jib of the BIG crane at Stirling set up to for the crane base to reverse onto. by jwwemyss
The weights for the BIG crane arriving at Stirling by jwwemyss
The jib of the BIG crane arriving at Stirling by jwwemyss
The base of the BIG crane at Stirling being prepared by jwwemyss
P.9's new signal SK6507 now in place by jwwemyss
Baby machines on P9 and 10 at Stirling by jwwemyss
Edge protection in place at Shore Road Span 5 by jwwemyss
Newton Crossover 3 by DAH
Newton Crossover 2 by DAH
Newton crossover by DAH
Prep works for relocating the 450tonne crane to the Riverside side of the tracks. by jwwemyss
The view at Span 4 of Shore Street on 11.09.13 by jwwemyss
The view looking towards Goosecroft Road on 11.09.13 by jwwemyss
Shore Road Span 5 Con-arches completed last night by jwwemyss
The outer Con-arch sections at Shore Road Span 5 were placed last night by jwwemyss
Span 5 at Shore Road has some Con-arch sections in place today by jwwemyss
Some Con-arch sections were placed last night at Span 5 Shore Road by jwwemyss
Some Con-arch sections at Shore Road Span 5 were placed last night by jwwemyss
The Shore Road old deck sections getting recycled by jwwemyss
HML 150 Years anniversary Celebration by harrypottertrain
The steel deck's transporter reversing out. by jwwemyss
Causewayhead's new deck end on by jwwemyss
Causewayhead crane lift done so the lifting tackle is removed by jwwemyss
Causewayhead's new deck and cills ready for their insitu reinforced concrete works. by jwwemyss